Greenline Offshore & Marine has shipped Arctic hoses for the Arctic Gate project.

30.08.2021
Greenline Offshore & Marine has shipped Arctic hoses for the Arctic Gate project.

Greenline has shipped Arctic-grade marine hoses from Dunlop Oil & Marine (UK). These hoses feature a Dunlop design specifically developed for the Arctic terminal, capable of withstanding operating temperatures down to -50°C. The loading project was developed in collaboration with Bluewater (Netherlands) and MacGregor (Norway). The "Arctic Gate" project is unique in the world in both its climatic parameters and operational characteristics. Greenline is ready to lease Dunlop Arctic-grade hoses from its warehouse in St. Petersburg or custom-make them to your specifications.

Greenline Offshore & Marine произвел отгрузку арктических шлангов для проекта «Ворота Арктики»