The Offshore & Marine Department of Green Line is signing a contract for the design, supply, and installation of an Offshore Berthing System in Africa. The previously installed OBS units at the seaport do not meet the increased demand of this region. The OBS units supplied to Libya will be used as a basis. Part of the shipped petroleum products will be directed to the needs of Russian bases in the African region. Assembly is planned to begin by the end of 2025 in St. Petersburg after final approval of all project details and delivery of the main components. Production costs are estimated at $19.8 million, with a production duration of 8 months.